Skip to content

How it works

MallAura advertising: from centre enquiry to partnership.

Four phases of the partnership. Each makes clear what is a concept visualization, what is technical verification and what is the agreement on partnership terms.

Partnership process

Four phases of the partnership.

  1. 01

    Send the basics

    Centre name, city, contact name and work email, with consent. Description and photos are optional.

  2. 02

    We verify its potential

    Footfall, visibility, advertising potential and technical feasibility.

  3. 03

    We prepare a proposal

    If suitable after assessment: a concept, technical solution and individual partnership proposal.

  4. 04

    We build and operate the surface

    Installation, advertising, monitoring and service.

Show the detailed process
  1. 01 · Assessment

    Initial centre enquiry

    We receive the centre name, city and contact details. Exact address, description, photos and technical details can be gathered later.

  2. 02 · Assessment

    Footfall and visibility check

    We evaluate footfall, sight lines and the advertising potential of the position.

  3. 03 · Assessment

    Review of photos and dimensions

    We verify the proportions of the surface, the frame, surroundings and viewing distance.

  4. 04 · Assessment

    Availability of the advertising position

    We check existing advertising surfaces, exclusivities and long-term availability.

  5. 05 · Technical

    On-site survey

    We physically inspect the glazing, access and lighting conditions.

  6. 06 · Technical

    Glass and door compatibility

    We assess the glass type and coordination with the automatic door system.

  7. 07 · Technical

    Safety and operational assessment

    We verify escape routes, sensors and operational constraints.

  8. 08 · Proposal

    Concept visualization

    A preview of the advertising surface on the specific glazing. It is a concept, not an approval.

  9. 09 · Proposal

    Proposed partnership terms

    Partnership scope and the scope of own airtime based on the location's potential.

  10. 10 · Proposal

    Technical design

    Solution details, cable routes, controller and service access.

  11. 11 · Proposal

    Internal approvals

    Coordination with the owner, facility management, fire protection and property management.

  12. 12 · Implementation

    Contract and production

    Conclusion of the partnership and operating agreement and preparation of the technology.

  13. 13 · Implementation

    Installation

    Mounting on the fixed glazing outside peak hours.

  14. 14 · Implementation

    Testing and commissioning

    Image calibration, power and data connection checks.

  15. 15 · Operation

    Start of broadcasting

    Deployment of advertising creatives and owner content according to the agreed share.

  16. 16 · Operation

    Advertising, monitoring and service

    Media operation, remote supervision, maintenance, operational reporting as agreed.

The schedule and scope of permits depend on the building, the entrance, the chosen technology and local regulations. We confirm specific conditions after the technical assessment.

Next step

Start with the centre and contact details.

Centre name, city, contact name and work email with consent are enough to begin. Description and photos are optional; exact address and technical details can follow later.

Get a proposal